Bartlett homes by decade and type
The median year built for housing units in Bartlett is 1992.1 About 35 percent of the village's 14,481 housing units were built from 1990 to 1999, and about 22 percent were built in 2000 or later.1 The 1990s are the village's biggest building decade.
About 71 percent of Bartlett's housing units are single family detached homes, and about 15 percent are single family attached homes such as townhomes.2 Around 7 percent are in buildings of five or more units.2 About 89 percent of occupied homes are owner occupied.2 More than seven out of ten homes in the village are detached houses.
Garage doors from the 1990s
For springs on a door from the 1990s or a newer opener for a 1990s garage, say when the house went up. For an opener that stops partway, say what it does before it stops.
Homes built since 2000
About a fifth of Bartlett's homes went up in 2000 or later. A once-over on a newer door covers the hardware pass on a sectional set that is still running square. Rollers on a door from the 2000s is the service page for worn rollers.
Bartlett's permit rule
Bartlett says a building permit is required prior to a building or structure being erected, constructed, built, enlarged, repaired, altered, replaced, moved, and when a change in ownership or occupancy has taken place.3 The rule is general; the Building Division is the office to ask whether a particular overhead door job needs one.
The permits the Building Division issues include Accessory Building/Structure, Driveway, Miscellaneous Electric, Remodel and Windows/Door.3 Those labels are the village's; which one, if any, a specific garage door replacement falls under is a question for the Building Division.
Once a permit has been issued, the document must be displayed so it is visible from the street until the work has been completed and a certificate of completion or occupancy has been issued.3
Bartlett's Planning & Development Services Department has three divisions, building, planning & zoning, and code enforcement, and is responsible for zoning reviews, building permits, inspections, property maintenance, health inspections and code enforcement for the village.4 It is the department a homeowner reaches for a question about a permit on a particular project.
Checking a contractor in Bartlett
Bartlett has contractors submit a contractor's license application through the village's online licensing portal.5 The page does not list which trades need a license or spell out what it takes, so what the village keeps on file is a question for the village.
Parking inside and the door that will not open
Bartlett police auto burglary prevention tips include trying to park the vehicle inside the garage instead of outside on the driveway or street.6 For a door that will not open or close, see the won't-open-or-close page.
If the overhead door is up in the tracks or hangs crooked across the opening, keep anyone in the doorway back, and the vehicle inside stays inside until the visit. The springs, cables and release belong to the technician.
The attached garage entry door in Bartlett
The attached garage guide requires at least a 4 inch concrete curb or step at every door opening between the garage and the house.7 That is a construction requirement.
The village's window and door guide says the door between the garage and the house must be 1-3/8 inch solid wood, 1-3/8 inch solid or honeycomb core steel, or 20 minute fire rated, and must be self latching with a self closing or automatic closing device.8 Those requirements cover the people door, not the overhead door a technician services on a repair call.
What Bartlett's garage and driveway guides say
Both the attached and detached garage guides require overhead outlets for future garage door openers, single receptacle type, and the attached guide says no GFCI protection is required on those outlets.7 Those are construction standards for a new garage build.
For a detached garage with a wide opening, the detached garage guide says that where the roof load over a 16 foot door opening falls on the header, the header must be three 2 x 12 inch boards, two 2 x 14 inch boards or the equivalent, and that studs must be doubled on all openings.7 That is a construction standard for new garages, not a claim about what any existing garage has.
For a driveway project alongside a door job, the village's driveway notes say the apron is the homeowner's responsibility, as an extension of the driveway that the village does not maintain or replace, and that no apron extension will be approved if a parkway tree is within ten feet.9 Driveway work has its own permit track.
Contractors and electrical work in Bartlett
The window and door guide says no work may begin until a building permit is issued, that contractors doing the work must be registered with the village and provide copies of their insurance and bond, and that homeowners may do window and door work themselves only on their primary residence.8 The guide covers windows, skylights and doors and does not name overhead garage doors. Bartlett's electrical code amendments say electrical work in new homes and remodeling must be done by a licensed electrical contractor, and that homeowners may do only minor electrical work that does not hook up or extend wiring to the electric panel or system.10
